More will follow as we go!
Wednesday, January 17, 2018
Custom Wheel Sneak-Peek!
Just a couple of little little teaser shots during mock-up of the custom wheels we had made for the Boss Schott Wheels make absolute jewelry for custom aluminum wheels. The machining tolerances on these wheels are almost unbelievable (check the fit on the billet center caps for a hint)!
More will follow as we go!
More will follow as we go!
Thursday, January 11, 2018
Rear Bumper Fabrication Project – Part 1
While
this blog showed little activity throughout most of 2017, the fact is, there
actually was a bit of progress being made on a somewhat ambitious endeavor I
decided to undertake. The following update spans several months of time in the project and MANY hours, but is condensed for easier reading. As of this writing, we are working consistently on the project in hopes of moving the project forward with much more energy. But first, a
little background:
A
few years back, I was on the hunt for a ready-made composite “tucked” rear
bumper and in the market; there were a few commercial outfits that offered
them. So, I set to doing my “homework”
and communicating with a number of builders who had experience ahead of mine, I
was able to quickly eliminate two of the offerings for either fit issues or
quality issues (or both). That left a
single source that talked a very good game and frequents most of the larger
Mustang forums on the net (mostly to maintain a passive-aggressive
advertisement campaign that is clearly frowned upon by most forum admins, but
that’s another story). Anyway, with some
trepidation, I ordered a tucked fiberglass bumper from the outfit and was
assured I would love it and that “countless” customers have installed them
without a single problem.
The
day came when my new bumper arrived and I headed straight out to fit it to the
car and admire the end result. Ya………never
happening. While the gel coat surface
was pretty decent, the bumper fit like absolute CRAP. So, trying to be the “good feedback”
customer, I documented every issue with pictures and verbal description, along
with measurements where needed and sent it over to the supplier.
Naturally,
on review of my notes, the response was the usual “nobody else ever had a
problem with it until now” and “there must be something wrong with your car” routine.
Given that data and Ford body assembly
manuals and specifications don’t lie, I returned the garbage bumper for a
refund and set off to thinking about alternatives. At the end of it, the options that were out
there really didn’t have the right “look” I was after anyway, so I guess there
was little lost in the end but time.
Selecting
the Fabrication Method
First
on my mind was to just knuckle-up and chop and section a factory steel bumper
and get on with it. But, if you have
ever done a chopped, sectioned and tucked steel bumper for a Mustang, you will
understand my hesitancy in choosing that route if other viable alternatives
exist.
After
a number of “happy-hour” conversations with friends and colleagues in the “biz”,
I was encouraged to build a bumper from scratch. But instead of steel, go to the trouble of
making a tooling-quality mold and fabricate the bumper from vacuum-bagged,
resin infused epoxy/carbon fiber (or epoxy/fiberglass) laminate.
My first
thought was; “Sure! Let’s pick the one
way to build a rear bumper that likely involved more work that working one up in steel!” What a great idea! As it turns out…….it was the perfect idea. Will it be faster? Nope.
Will it be less expensive?
Nope. Do we have all of the tools
to produce the mold? Nope (but
close). Will it work to make a bumper
exactly the way we want? OH YES. Will it allow us to make extra parts, exactly
like the original, over and over again?
You betcha! Are we just a wee bit
crazy? Beyond the shadow of a
doubt! So………..guess what we’re gunna
do????
Building
the Plug
On
a complex shape like a rear bumper, the first order of business is to make a
full scale model of the exact shape you want in a medium that can be easily shaped. This model is often referred to as the “plug”
or “buck” and in its finished form, will be a beautiful “A”-class surfaced
model of the exact shape that the composite rear bumper will be. From this plug, the tooling mold will be pulled
and all finished parts will be molded in it.
This is a rather gross oversimplification, but you get the idea.
After
countless hours walking my brain through the entire process I would use to
create my unique, tucked rear bumper, I decided to construct the plug using a
simple steel support structure with 2-part pourable, closed-cell urethane foam
poured around it to perfectly match the plug form to the body. This would allow the foam plug to perfectly
index to the body every time so even the smallest details could be maintained
and were repeatable each time the bumper model would need to be taken off the
car for work.
After
protecting the entire tail of the car with masking tape and waxed foil tape for
easy release of the foam, a temporary box was fastened to the back of the car
to contain the 2-part expanding foam we would use to produce the core of our
bumper plug. With an expansion ratio of roughly
30:1, we would need less than ½ gallon of foam base stock to complete the plug
core.
The
steel support structure was bolted into place through the factory bumper
bracket holes and the urethane foam components were mixed and poured into the
temporary box and allowed to expand to match the body contours and cure
overnight. The next day, the box as cut
away from the rigidly cured foam “blob” now stuck to the back of the car. The mounting bolts were removed and the plug
core was gently pulled away from the body, revealing a perfectly molded inner
surface that registered very securely into the features of the rear bodywork.
Next,
the plug core was bolted back on and the rough trimming of the shape began with
very simply hand saws, an electric knife and Surform tools. After about an hour, the bulk of the foam
core was carved away and the very slightest vestiges of a new bumper shape were
starting to emerge. At this point, there
would no longer be a need for the crude tools of rough shaping and all other
work would involve very delicate sanding, measuring, sanding, measuring,
sanding, and………measuring.
![]() |
| After the foam has expanded and cured, the temporary box is removed and the rough foam buck is rough trimmed to get rid of the extra material. |
There
really is no secret to establishing the final shape of the bumper. In its simplest description, it’s pretty much
the “artist’s eye” that guides the form.
I have had the image of what I wanted in a rear bumper clarified in my
mind’s eye for several years, so I would often close my eyes and envision what
I wanted and then open ‘em up and remove bits of foam that didn’t look like my
mental image.
![]() |
| With simple sanding boards and Surform tools, the basic bumper shape is roughed-in. The shape is roughly 1/2" to 3/4" larger than the final shape will be. |
![]() |
| After rough shaping, the first stages of intermediate shaping can begin. This takes the shape to with 1/8" or less of the final bumper profile. |
Since
the shape is essentially a mirror image from left to right, I made a series of
almost 20 templates to document the final shape of the plug and allow me to
replicate the shape from left to right as closely as possible. The process to arrive at the final shape took
roughly 80 hours of hand work before I was happy with the shape and fit of the
base plug. And once I had that shape
completed and all of the templates made and massaged to fit perfectly, I
removed the plug, placed spacers between the body mount and plug and
reinstalled the plug again. Naturally,
this placed the entire plug surface proud of the body by the thickness of the
spacers, so I had to once again shape the entire plug back to the desired
shape. However, since the templates were
now fully complete, the process of “drawing down” the final plug shape was only
about 8 hours.
![]() |
| Final shaping begins with lighter grit sandpaper boards and blocks and once a shape is defined, a template is made to ensure the shape is maintained and can be repeated later on. |
![]() |
| The final foam bumper plug shape is established and checked many times with the templates to make absolutely sure the shape is correct. |
“Skinning”
the Plug
With
the plug now in the exact shape I want, it needs to be protected from damage so
the final bodywork and finishing can take place. The foam plug surface is now very delicate
and is easily damaged by even the slightest impact. So, to protect the plug, a thin covering of
an epoxy/fiberglass laminate must be applied to the plug to allow the shape to
be preserved and protected and to provide a solid base on which body fillers,
primers and paints can be applied to finish the plug. The process of applying the protective laminate
surface to the plug is called “skinning”.
![]() |
| This very light, 2-oz fiberglass veil cloth is used in the process of skinning the plug. This material is very shear and when wet-out with epoxy resin, it virtually disappears into the laminate skin. |
![]() |
| A layer of regular masking tape is placed around the perimeter of the bumper to help with releasing after the epoxy laminate has cured. |
Quite
simply, skinning the plug involves wetting the surface of the foam plug with a
special epoxy laminating resin and embedding (laminating) a few thin layers of
very light fiberglass cloth into the resin surface. Special tools are used to roll out any air
bubbles that may be trapped in the resin and cloth and the matrix is left to
cure for several days to ensure complete hardening of the resin and
stabilization of the plug.
Trimming
the Plug
Once
the epoxy laminate “skin” has fully hardened, the plug is pulled from the body
and any excess flash is trimmed off the plug back to the original shape. Now, the bumper plug is much more stable and
solid and it can be handled with confidence that no damage will occur and the
shape will be maintained even when the bumper plug is not bolted to the body.
Prepping
the Plug for Finishing
With
the plug now fully skinned, the heavy masking was removed from the body and the
plug was test fit to the body to begin to establish the scope of the finish
work required. In the “skinned” state,
the plug is still pretty rough on the surface and will require very fine detail
work to get all of the gaps perfected and the surfaces filled and finished to the
perfect, class ”A” surface necessary to pull a mold from. The bottom line is simple: To get a perfect part, we need a perfect mold
surface. And to get a perfect mold surface,
we need a perfect plug! Needless to say
there is a TON of work left on this plug to get where we need to go, but at
this point, the shape is exactly what I want and it achieves the exact look I
want in a tucked rear bumper. When
mocked up on the car with tail light bezels in place, the look is very clean
and changes the look of the 70 Mustang tail substantially without looking odd,
angular or “industrial.”
Now,
the process will slow down once again as we begin to refine the plug edges to
achieve the desired gaps all the way around the surface and to begin final
shaping of the license plate aperture.
Then we will move on to preparing the surfaces for final finishing on
our way to mold making. LOTS of work to
go, but in the end, I think it will all be worth it!
Tuesday, January 9, 2018
2017 In Review – New Rear Bumper Project
"Where the heck have you been?"
Honestly, 2017 was an unimaginable blur in life that welded together some of the happiest, stressful, frustrating and saddest times all into a year that, in the end, I was happy to see off with my beloved family around me. In the end, there was A LOT that happened in 2017 that took precedence over car building, but believe it or not, progress was made on a particularly complex element of the Boss project as you will see in a later post. However, as a quick catch-up, 2017 went something like this:
- I Got Engaged!
- Wind Storm
Early
Spring brought a substantial wind storm to the area that managed to do
significant damage to my house roof (shop was good!!). End result was a load of expensive repairs
required. More later.
- Coupe Tuning
- Bathroom Remodel (Finished in October)
- Crushed Shed (First casualty of wind storm)
- New Roof & Gutters (Second casualty of wind storm)
The
second casualty of the windstorm, we had to have the entire roof replaced on
the house, and while we were at it, replaced the house gutters and added them
to the shop! Bottom line = $$$$$$
- Introducing: The Dodge Demon SRT
After almost 2 years of my secret day-job life, I was proud to have been able to enjoy the launch of my latest “baby”. After extremely confidential work, our FCA SRT Engine Group was able to enjoy the launch of our Dodge SRT Demon! Currently the quickest production car in the world and the highest output V8 in history, the lists of “firsts” in this car are indeed impressive. But perhaps most entertaining and rewarding is watching this production car heft the front tires clear of the track surface on production tires! Yes ladies and gents, THIS is what I do in my “day job”.
- New Tractor
- Niagara Falls with Family
- Daughter’s Wedding
- Mom’s New Knee
After
years of suffering with painful, failing knee joints, my Mom finally decided to
have her worst knee replaced in mid-September.
With outstanding preparation on her part and equally excellent surgical
prowess from her surgeon, Mom’s knee replacement was textbook-perfect and her
recovery truly impressive. In just a
month from her surgery, she was done with rehab and discharged from physical
therapy. And here, at just three months
after surgery, Mom is already planning the replacement of her other knee! Lack of pain is evidently a remarkable
motivator!
- Mom & Dad’s 50th
- Well Tank & Main Gas Line
- Lost My Grandmother
- New Grandchild on the Way
As
it seems to have always been in our family, blessings come in the most
unexpected ways and times. On the heels
of losing our beloved “Omi”, our son informed us that he and his betrothed were
expecting a child, our fourth grandchild.
So where loss had dominated the mind and heart, a new life will arrive
and be celebrated in the summer of 2018!
- Shop Tool Re Org
Monday, February 13, 2017
Lokar E-Brake Overview & Install – Mostly Good, but…..
Lokar
is well known for a host of innovative, nice looking and top quality hot rod
and muscle car components. Quite a while
ago, I decided to go with their universal emergency brake handle kit along with
their premium cable kit to craft a tunnel-mounted e-brake that looked simple
and unobtrusive in the car. I looked
long and hard at the many factory Ford e-brake setups out there and they just didn’t
quite have the right look I was after.
A
while back, I mocked up the Lokar handle as an “underhung” configuration,
mainly to allow me to fabricate the slot for the mechanism in the transmission
tunnel and get all of that finished before the under car bed liner coating could
go on. Unfortunately, I pretty much knew
that configuration was going to present significant clearance issues to the
front drive shaft u-joint if I allowed it to hand that low in the tunnel. The fix, as it ended up, required a bit of
surgery on the Lokar E-Brake frame to get the handle and cable setup to tuck
tightly up into the tunnel and still operate the rear e-brake levers on the
calipers (more on this later).
The
cables were an off-the-shelf setup designed for the “Thunderbird” rear disk
brakes according to Lokar. This is
important as the “Mustang” brake cables won’t fit the Cobra rear brake calipers
correctly. Who knew! Ha!
Once we got this little detail ironed out with Lokar, the installation
was a matter of proper routing and cutting them to the proper length to
interface with the e-brake handle.
Easiest part of the job!
The
final fit-up of the system was a walk in the park. Everything bolted together like a factory
setup, in spite of the fact that the Lokar installation instructions are rather
“modest” at best. Now, for the “rest of
the story”: If you have your heart set
on the Lokar e-brake setup stopping or even positively securing your car in a
fixed spot, you will be disappointed.
The bottom line is the handle is too short to develop enough leverage on
an integrated disk brake caliper e-brake to make it much more than a symbolic gesture
at the job. This was not altogether a surprise,
mind you, but it was a bit more disappointing than I expected given the
otherwise top quality of every part in the kit.
That being said, this same basic setup works just fine on the drum brake
combination on our 32 Ford Coupe hot rod and I suspect that has a lot to do
with the fact that there is a lot more friction surface available with the
brake shoes and the drum brake is “self-energizing” to a greater extent. But, at the end of the day, for a disk brake
setup with an integrated e-brake mechanism, the handle length dictates
available leverage and this just ain’t got enough of it to be 100% there.
At
the end of the day, I won’t change a thing for the time being and will revisit
the idea of fabricating my own handle at some later date. But for now, the spirit and intent of the
system is in place and it really does look very clean.
![]() |
| Without modifications to drop the assembly into the tunnel slot about 3/8", the Lokar e-brake handle would not have fit quite right. Notice how tight to the tunnel roof the pivot is. |
![]() |
| The cable anchor bracket eventually dictated the target height of the e-brake handle. Here, you can see how clean a simple the cable mount hardware is. |
![]() |
| Fully fit up and in the "off" position, the entire cable mechanism is snug to the top of the tunnel and will easily clear the drive shaft. |
![]() |
| Looking from the back of the car, the Lokar e-brake cables route nicely along the top of the tunnel. |
![]() |
| From the tunnel, the left side e-brake cable routes to the caliper without much drama. |
![]() |
| Left caliper showing the cable housing connection and cable end detail. |
![]() |
| Here is the right side cable routing. Again, simple with no drama. |
![]() |
| Right side caliper with cable connection and end detail. |
Wednesday, February 8, 2017
Fuel System Install Part 2 – Hard Lines, Front Soft Lines & Pump Plumbing
When
we left off last, the rear soft lines had been completed and the fuel pump
module had been placed in the tank.
Moving forward from here, we started phase 2 of the fuel system install
by permanently mounting the fuel tank in place using butyl strip caulking to
seal the tank flange to the trunk aperture.
With momentum on our side, the selection and routing of the short
lengths of soft line to the trunk area bulkhead fittings could be easily worked
out. Once we had something that allowed
clean bends in the hoses and no interference with any surrounding points, the
lines and fittings were mated up and set into place. Almost a shame that all of this will be
covered by the trunk floor during upholstering.
Next
on the agenda was perhaps the most difficult aspect of fuel system
installation: Custom fabricated hard
lines that make up the bulk of the feed and return line length. I am a bit particular in how fluid lines
look, and prefer that they remain as unseen as absolutely possible without
compromising function. In addition, I
demand that all fluid lines are leak-free straight off and that they are easy
to work with. LOTS of builders (most in
fact) use stainless steel tubing for hard lines in both brake and fuel systems
and there is absolutely nothing wrong with that. However, anyone who has worked with stainless
will tell you it can be rather unforgiving to bend and flare and leaks are
something to be chased on all too frequent of occasions. Coupled with that, stainless is rather
expensive and can be somewhat variable in quality.
Over
the years, I have become an absolute cheerleader for American-made
copper-nickel-ferrous alloy (a.k.a. “cunifer”) hard line material in everything
from brakes to fuel and oil lines. This
material is very durable, will not corrode, bends easily and cleanly, flares
like a dream and is good to about 3000psi.
Since
most of the fitting hardware on this fuel system is of the 37-degree AN flare
variety, the hard lines will have to be flared accordingly. And since I insist on using an aircraft industry
roll-flaring tool for hard line work, the cunifer material outshines any
stainless tubing in almost all respects, save perhaps, visual appeal in an
exposed application. What can I say,
some people like shiny stuff!
The
feed and return lines for the Boss are fabricated from 3/8” cunifer material as
an (almost) matching pair of lines run down the inboard side of the subframe
connectors from the rear to the front and then passing through the right front
subframe to just under the right torque box enclosure. Of course, this sounds
so easy like that, but there is about 6 hours of work in fabricating these two
lines to ensure they match beautifully and terminate in exactly the location
they are needed to allow the front soft lines to be fitted with precision.
In response
to the many questions I get regarding tubing work; it’s worth mentioning that
you should consider the investment in top quality tools a necessity in making hard
lines worthy of display. Quality tubing
benders are an absolute must and the same goes for flaring tools. I swear by my Imperial Eastman benders,
Ridgid #376 roll-form 37-degree AN flaring tool, Kwix-UK tube straightening
tools, and the Eastwood #25304 pro flaring tool and can’t imagine being able to
do the work on this fuel system without them!
With
hard lines run, the fuel lines could be finished up with the final (and rather
tricky) job of making the front soft lines that pass through the right torque
box to the inner apron in the engine bay.
It begins with careful placement of the pass-thru holes that will get
grommets inserted to prevent any damage to the rubber lines as they pass
through the sheet metal panels. Since
the lower and upper hard line “pierce points” are almost lined up from front to
back, the rubber lines can be passed through the torque box is a “lazy S”
fashion that keeps the lines kink-free and away from any sharp edges along the
way.
With
a bit of extra hose length on both ends of each hose, the apron fittings are
secured first to establish the absolute routing of the lines in the fender well
area. Following that, the rear hose ends
can be precisely cut to length and the AN fittings added to mate to the hard
lines perfectly and with minimal visibility.
With
the exception of a few small detail bits, that puts a period on the fuel system
installation! The routing of the lines
is such that, even when on the lift, the system is exceptionally tidy and gives
little away to the fact that the car will be fuel injected and therefore
maintains the style of subtle detail we’ve been after from the start.
![]() |
| Before the rubber lines could be run efficiently, a little noodling on fitting choice and position was required. |
![]() |
| With fittings chosen, it was a simple matter of measuring and cutting each hose to length and assembling the fittings and clamps. Done! |
![]() |
| With the hard lines flared and tube nuts installed, the rear hard line connections were made. These fittings almost fell together on their own. A reward of very careful line layout and fabrication. |
![]() |
| The cunifer hard lines were carefully formed to the inner subframe connector contours and remain out of sight with the car at ride height. |
![]() |
| Using factory holes through the front subframe, the hard lines were routed cleanly through to the outside of the rail and aligned with the lower rear torque box. |
![]() |
| Here you can see the finished hard lines at the front termination . The soft lines will mate directly to these lines once they have been passed through the torque box rear wall. |
![]() |
| I am frequently asked about the type of line clamps I use in my builds and here they are "nekid". These are Quick Clips and install in a drilled hole using a "Christmas tree" barb stem. Very clean. |
![]() |
| Another shot of the Quick Clips used for mounting the hard lines. |
![]() |
| Here, the front hard line to soft line fittings are visible. You can see how inconspicuous the entire operation is, giving little away that the car will be fuel injected. |
Wednesday, January 25, 2017
Fuel System Install Part 1 – Rear Soft Lines and In-Tank Fuel Pump
A little
while ago, it was decided that the Boss would get fuel injection. However, the intent in the whole plan was to
make the injection system as “minimalistic” in appearance as possible. In other words, when the hood is raised, the
intent is that the engine bay carries “the look” of a modified engine bay
belonging to a Boss 302.
Until
rather recently, there were no throttle body injection systems that quite fit
the bill. But now, the market has almost
exploded with very reasonably priced and well-rounded systems that satisfy “the
look” as well as the functionality and convenience of modern fuel injection.
Since
our path is determined, the time had come to start configuring the fuel system
to support a sporty fuel injected engine combination, while maintaining “the
look” as much as possible all over the car.
I admit, I’ve always wanted people to have to really work to take in all
of the details of this build (and there are/will be THOUSANDS), with some being
relatively obvious and clearly drawing attention while many others lurk in your
subconscious before your eye recognizes them.
For
a long time, I have been a fan of Aeromotive fuel system components, so it was
a natural fit that we would choose their Phantom 340 Stealth in-tank fuel pump system as our go-to combination. This
kit is of exceptional quality and installation is relatively straight forward. However, the entire system would require
quite a lot of plumbing and careful component selection to ensure peak
performance and longevity in a clean and unassuming package. So, that’s where we started.
First
on the agenda was to select proper fuel line materials and fittings along with
a routing path that worked well the full length of the floor to the engine
bay. For fuel line, the first reaction
by many is to install the venerable braided stainless lines with AN
fittings. While the AN fittings are more
than adequate, the typical braided stainless fuel line isn’t really optimum for
modern injection systems and fuels.
The
biggest problem with typical rubber AN lines is they essentially out gas fuel vapor
over their lifetime at a fairly high rate (about 1 gallon fuel loss per foot of
-06 hose per year!). The two solutions
are a Teflon lined AN hose or a modern rubber fuel injection hose like Gates Barricade. With the Gates product, fuel vapor
loss is eliminated and the flexibility and ease use makes it a perfect
candidate for a modern hot rod when trying to keep the appearance subtle. And best of all, the availability of push-on
AN fittings like the Aeroquip AQP Socketless fittings makes this system capable of
satisfying all of our needs in a simple package.
Another
consideration is that running flexible AN lines for the length of the car makes
for a difficult routing job and makes cleanliness an even tougher
objective. In our case, the soft lines
are exclusive to the front and rear zones of the car with the connection
between them (and the longest runs) taken up by the use of “Cunifer” metal hard
lines. Cunifer lines are among the very
finest available and are an alloy of copper (Cu), nickel (Ni) and iron (Fe) in
a 60/20/20% typical composition respectively.
They are highly resistant to corrosion, bend and flare beautifully, and
are most often found in brake lines on higher-end performance and racing cars
all over the world.
Our
fuel system would be a combination of soft and hard lines beginning in the trunk
and ending in the engine bay. The first
order of business was to carefully plan the entire feed and return circuit
route from front to back and measure and sketch the plan making notes on component
placement, bend locations, fittings required and component clearance. At the same time, we needed to make sure the
entire system was easily accessible and serviceable anywhere the car would be
driven.
With
our line plan established, we set off to plumbing the soft lines at the rear of
the car. This began with installation of
the bulkhead fittings exiting the trunk area on the right side of the car as
well as installing the mating fittings at the front of the car in the engine
bay. This established our absolute “pierce
points” at the front and back and we could now easily visualize the start and
end of our under-car fuel system.
Next,
we mounted the Aeromotive 10-micron fuel filter and bracket in its
predetermined spot, inboard of the rear sub frame. The filter is, of course, another pair of
absolute hard points and needed to be permanently positions to allow accurate
routing of the soft lines in and out.
With
the hard points now finalized, we began fabricating the rear soft lines
starting at the rear and working forward to the filter. I like to install an AN fitting in the free
end of the hose and mount it to the bulkhead fitting so it is a stable and easy
reference while routing the rest of the line in the most optimum way. This acts as a “third hand” in a way and
makes routing so much easier.
Once
the feed line route to the filter is finalized, I cut the line about a foot
longer than required and move to the return line. The return line is routed it along the same
path, and the line is cut at the same length as the feed line to ensure we can
match the fitting locations as they join the chassis hard lines that we will
make later on.
To
aid in securing the lines and maintaining the proper routing, we used a few
aluminum line clamps that secure and separate the feed and return soft lines
and allow them to be mounted to the chassis in a very clean way.
With
the rear soft lines in place, it was time to address the installation of the
Aeromotive in-tank fuel pump system.
This kit is a rather amazing piece of business that allows almost any
original muscle car fuel tank to be converted to a modern, in-tank electric
fuel pump module in an evening. The
process, in fact, is pretty straight forward, with the most critical and
complicated event being that of properly positioning and cutting the hole in
the top of the tank for the pump mount. Once
the hole is cut to the proper 3.25” diameter, a nifty positioning ring is used
to establish the drill pattern for the 10 mounting studs to pass through the
top of the tank from the inside stud flange out.
Deburring
the fresh holes is going to be a challenge, especially if you have ham fists
like mine and can barely get a paw down the hole to try to access the drilled
holes from inside. A skinny, malnourished,
but enthusiastic helper will go a long way in this endeavor for little more
investment that a few pops and a box of Band-Aids.
Next,
it is best to vacuum out as much of the chips and debris from the tank as
possible followed by a thorough washing with a solution of simple green and
water. This will do a very good job of
getting all of the metallic dust and schmutz out of the tank so no future
damage to the pump will occur. Of
course, the tank should be dried completely before installing the pump module components.
With
the tank modifications complete and the inside washed and dried, the foam and
ballistic rubber “basket” can be trimmed to fit the tank depth (plus 1 inch). Once that is complete, and with the help of
the pattern fixture, the basket can be inserted into the tank. The compression on the foam will act to help
retain the stud ring and make the rest of the installation much easier. With that, the hardest part of the installation
is over!
At
this point, the pump hanger is measured and trimmed to make the pump module
overall length a match to the tank depth and the module is assembled as a unit
for the final time. Next, the pump
flange gasket is placed over the mounting studs and the pump module is lowered
into the foam basket and secured to the studs with the sealing washers and lock
nuts provided in the kit.
While
this is a bit of an oversimplified account, the project is certainly worth the
effort and all of the included hardware is of the finest quality. The remaining electrical connectors and
wiring terminal boots will be saved for the wiring project later on, but for
now, the tank is complete and we will move on to mounting it in the chassis and
finishing the soft lines in the trunk area.
From
here, we will move on to fabricating the front soft lines and finish it up by
fabricating the hard lines to connect the works together. Look for Part 2 soon!
![]() |
| We start by laying out the position of each AN bulkhead fitting so the fuel line "end-points" can be established. |
![]() |
| With the hole positions established, the centers are marked and pilot drilled. |
![]() |
| A Uni-Bit is the best tool to open up nice clean holes in sheet metal. Here, the second bulkhead fitting hole is drilled in the right side trunk area. |
![]() |
| With the bulkhead fittings in place, the trunk fittings look especially clean. The silver-white washers are actually Earl's Stat-O-Seal washers that provide a weather tight seal to the fittings. |
![]() |
| On the opposite side of the trunk floor, the feed and return line end point fittings are put into place to ensure proper fit. |
![]() |
| The front engine bay apron bulkhead fittings are next and install in exactly the same way as the trunk fittings. |
![]() |
| From inside the engine bay, the feed and return fittings are very unassuming and tidy. |
![]() |
| The final "hard point" element is the 10-micron fuel filter and bracket. Here we have mounted the assembly in a secure location just inside of the right rear sub frame. |
![]() |
| Here are the soft lines for the feed and return circuits completed. Notice there are a minimal number of fittings and no severe bends of disruptions in the line routing. Smooth is good! |
![]() |
| Here are the aluminum line separator clamps I use when routing fluid hoses. Th bolt in the center is modified to no only close the clamp but to mount it to the chassis as well. |
![]() |
| Fuel pump installation begins by carefully positioning and then drilling the 3 1/4" hole in the top of the tank that allows the pump module to pass through. |
![]() |
| With the hole cut, the painful deburring process can begin. The large hole is by far the easiest to deburr. The whole game changes when the smaller mounting stud holes are drilled....... |
![]() |
| This clever pattern fixture is included in the kit and helps to position the flange mounting holes as well as aid in the installation of the pump basket later on. |
![]() |
| With the tank depth accurately measured, the filter basket foam is marked and cut to size. The foam is always cut 1 inch LONGER than the measured tank depth to ensure proper fit. |
![]() |
| And just like that, the foam basket in inserted into the tank and the compression against the bottom of the mounting stud ring inside is enough to keep it in place during the rest of the install. |
![]() |
| The nuts and sealing washers are snugged up around the mounting flange and the installation is done! The finished product looks mighty impressive and will support our fuel injection system with ease. |
Subscribe to:
Posts (Atom)





































































